Slow and Steady...

in #blog2 years ago

The pace at which the work is going can be summarised with the post's subject.

The passage wall that will house the stairs was started today above the DPC.

IMG_20200718_161150.jpg
The Left Elevation

IMG_20200718_161204.jpg
The exit point.